Jose M Framiñán
Jose M Framiñán
Industrial Engineering, Universidad de Sevilla
E-mail confirmado em us.es - Página inicial
Título
Citado por
Citado por
Ano
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
I Ribas, R Leisten, JM Framiñan
Computers & Operations Research 37 (8), 1439-1454, 2010
4112010
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
JM Framinan, JND Gupta, R Leisten
Journal of the Operational Research Society 55 (12), 1243-1255, 2004
2782004
An efficient constructive heuristic for flowtime minimisation in permutation flow shops
JM Framinan, R Leisten
Omega 31 (4), 311-317, 2003
2402003
The CONWIP production control system: review and research issues
JM Framinan, PL González, R Ruiz-Usano
Production Planning & Control 14 (3), 255-265, 2003
2122003
Approximative procedures for no-wait job shop scheduling
CJ Schuster, JM Framinan
Operations Research Letters 31 (4), 308-318, 2003
1792003
Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem
JM Framinan, R Leisten, C Rajendran
International Journal of Production Research 41 (1), 121-148, 2003
1712003
Comparison of heuristics for flowtime minimisation in permutation flowshops
JM Framinan, R Leisten, R Ruiz-Usano
Computers & Operations Research 32 (5), 1237-1254, 2005
1522005
Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
JM Framinan, R Leisten, R Ruiz-Usano
European Journal of Operational Research 141 (3), 559-569, 2002
1322002
Manufacturing scheduling systems
JM Framinan, R Leisten, RR García
An integrated view on Models, Methods and Tools, 51-63, 2014
1192014
A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: Multi-agent scheduling problems
P Perez-Gonzalez, JM Framinan
European Journal of Operational Research 235 (1), 1-16, 2014
1062014
A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem
V Fernandez-Viagas, JM Framinan
International Journal of Production Research 53 (4), 1111-1123, 2015
982015
On the bullwhip avoidance phase: the synchronised supply chain
E Ciancimino, S Cannella, M Bruccoleri, JM Framinan
European Journal of Operational Research 221 (1), 49-63, 2012
982012
Architecture of manufacturing scheduling systems: Literature review and an integrated proposal
JM Framinan, R Ruiz
European Journal of Operational Research 205 (2), 237-246, 2010
962010
New hard benchmark for flowshop scheduling problems minimising makespan
E Vallada, R Ruiz, JM Framinan
European Journal of Operational Research 240 (3), 666-677, 2015
932015
On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem
V Fernandez-Viagas, JM Framinan
Computers & Operations Research 45, 60-67, 2014
902014
Dynamic card controlling in a Conwip system
JM Framinan, PL Gonzalez, R Ruiz-Usano
International Journal of Production Economics 99 (1-2), 102-116, 2006
892006
A new vision of approximate methods for the permutation flowshop to minimise makespan: State-of-the-art and computational evaluation
V Fernandez-Viagas, R Ruiz, JM Framinan
European Journal of Operational Research 257 (3), 707-721, 2017
882017
Closed-loop supply chains: What reverse logistics factors influence performance?
S Cannella, M Bruccoleri, JM Framinan
International Journal of Production Economics 175, 35-49, 2016
872016
Metrics for bullwhip effect analysis
S Cannella, AP Barbosa-Póvoa, JM Framinan, S Relvas
Journal of the Operational Research Society 64 (1), 1-16, 2013
772013
The effect of inventory record inaccuracy in information exchange supply chains
S Cannella, JM Framinan, M Bruccoleri, AP Barbosa-Póvoa, S Relvas
European Journal of Operational Research 243 (1), 120-129, 2015
672015
O sistema não pode executar a operação agora. Tente novamente mais tarde.
Artigos 1–20