Investigating the value of integrated operations planning: A case-based approach from automotive industry S Kumar, BS Purohit, V Manjrekar, V Singh, BK Lad International Journal of Production Research 56 (22), 6971-6992, 2018 | 38 | 2018 |
Integrated yet distributed operations planning approach: A next generation manufacturing planning system S Kumar, V Manjrekar, V Singh, BK Lad Journal of Manufacturing Systems 54, 103-122, 2020 | 31 | 2020 |
Integrated production and maintenance planning for parallel machine system considering cost of rejection S Kumar, BK Lad Journal of the Operational Research Society 68, 834-846, 2017 | 22 | 2017 |
Integrated approach for job scheduling and multi-component maintenance planning in a production system S Kumar, BS Purohit, BK Lad 5th international & 26th All India Manufacturing Technology, Design and …, 2014 | 6 | 2014 |
Controlling thermal comfort of passenger vehicle using fuzzy controller A Singh, S Kumar International Journal of Engineering Research and Applications (LJERA) 2 (4), 2012 | 3 | 2012 |
Optimization of Multi-item Operation Sequences and Batch Size for Non-Parallel Capacitated Machines: A Case Study BS Purohit, S Kumar, BK Lad, V Manjrekar, V Singh International Journal of Performability Engineering 13 (5), 557, 2017 | 2 | 2017 |
Effect of maintenance resource constraints on flow-shop environment in a joint production and maintenance context S Kumar, BK Lad IEEE International Conference on Industrial Engineering and Engineering …, 2016 | 1 | 2016 |
Industry 4.0 readiness assessment for SMEs: A state-of-the-art literature review MSK Sandeep Kumar, Bhupesh Kumar Lad International Conference on Precision, Meso, Micro and Nano Engineering 11 …, 2019 | | 2019 |
Investigating the value of integrated operations planning considering multiple dependent shop-floor functions: realizing industry 4.0 S Kumar Indian Institute of Technology (IIT) Indore, 2018 | | 2018 |
Maximizing Overall Equipment Effectiveness by Joint Consideration of Production, Maintenance and Quality for Flow-Shop Environment S Kumar, BK Lad, V Manjrekar, V Singh | | 2016 |
Joint optimisation of maintenance schedules and inventory levels in a manufacturing system A Bhargava, S Kumar, T Rokade, BK Lad 2nd International Conference on Intelligent Robotics, Automation and …, 2013 | | 2013 |
ROOT CAUSE FAILURE ANALYSIS OF BLANKING DEVICE OF STRAINER HOUSING USED IN STEAM TURBINE S Kumar, A Singh, C SasiKumar International Journal of Research in Engineering and Technology (IJRET) 2 …, 2013 | | 2013 |