Follow
Isabel Lopes
Isabel Lopes
Verified email at dps.uminho.pt
Title
Cited by
Cited by
Year
Reconfigurable standardized work in a lean company–a case study
A Pereira, MF Abreu, D Silva, AC Alves, JA Oliveira, I Lopes, ...
Procedia Cirp 52, 239-244, 2016
962016
Preventive maintenance decisions through maintenance optimization models: a case study
S Vilarinho, I Lopes, JA Oliveira
Procedia Manufacturing 11, 1170-1177, 2017
892017
Requirements specification of a computerized maintenance management system–a case study
I Lopes, P Senra, S Vilarinho, V Sá, C Teixeira, J Lopes, A Alves, ...
Procedia Cirp 52, 268-273, 2016
862016
Six Sigma application for quality improvement of the pin insertion process
JP Costa, IS Lopes, JP Brito
Procedia Manufacturing 38, 1592-1599, 2019
842019
Developing dashboards for SMEs to improve performance of productive equipment and processes
S Vilarinho, I Lopes, S Sousa
Journal of Industrial Information Integration 12, 13-22, 2018
732018
Classification methodology for spare parts management combining maintenance and logistics perspectives
C Teixeira, I Lopes, M Figueiredo
Journal of Management Analytics 5 (2), 116-135, 2018
672018
Multi-criteria classification for spare parts management: a case study
C Teixeira, I Lopes, M Figueiredo
Procedia Manufacturing 11, 1560-1567, 2017
492017
Condition-based maintenance implementation: a literature review
HN Teixeira, I Lopes, AC Braga
Procedia Manufacturing 51, 228-235, 2020
462020
Principles and practices of lean production applied in a metal structures production system
R Carvalho, AC Alves, IS Lopes
International Association of Engineers (IAENG), 2011
432011
Application of data mining in a maintenance system for failure prediction
P Bastos, I Lopes, L Pires
Safety, Reliability and Risk Analysis: Beyond the Horizon: 22nd European …, 2014
422014
A maintenance prediction system using data mining techniques
P Bastos, I Lopes, L Pires
World Congress on Engineering 2012 3, 1448-1453, 2012
412012
Evaluation and improvement of maintenance management performance using a maturity model
MA Oliveira, I Lopes
International Journal of Productivity and Performance Management 69 (3), 559-581, 2020
402020
Use of maintenance performance indicators by companies of the industrial hub of Manaus
M Oliveira, I Lopes, C Rodrigues
Procedia CIRP 52, 157-160, 2016
392016
Prioritizing quality problems in SMEs: A methodology
HN Teixeira, I Lopes, S Sousa
The TQM Journal 27 (1), 2-21, 2015
382015
Design procedure to develop dashboards aimed at improving the performance of productive equipment and processes
S Vilarinho, I Lopes, S Sousa
Procedia Manufacturing 11, 1634-1641, 2017
352017
Measuring and managing operational risk in industrial processes
S Sousa, E Nunes, I Lopes
Fme Transactions 43 (4), 295-302, 2015
332015
Quality improvement practices adopted by industrial companies in Portugal
IS Lopes, EP Nunes, S Sousa, D Esteves
International Association of Engineers (IAENG), 2011
322011
Using Six Sigma to improve complaints handling
P Abreu, S Sousa, IS Lopes
International Association of Engineers (IAENG), 2012
292012
Maintenance management based on organization maturity level
MM Oliveira, IS Lopes, D Figueiredo
262012
Supporting maintenance scheduling: A case study
P Senra, I Lopes, JA Oliveira
Procedia Manufacturing 11, 2123-2130, 2017
232017
The system can't perform the operation now. Try again later.
Articles 1–20