BIM extension for the sustainability appraisal of conceptual steel design AH Oti, W Tizani Advanced Engineering Informatics 29 (1), 28-46, 2015 | 120 | 2015 |
Structural sustainability appraisal in BIM AH Oti, W Tizani, FH Abanda, A Jaly-Zada, JHM Tah Automation in Construction 69, 44-58, 2016 | 107 | 2016 |
Rotational stiffness of a blind-bolted connection to concrete-filled tubes using modified Hollo-bolt W Tizani, A Al-Mughairi, JS Owen, T Pitrakkos Journal of Constructional Steel Research 80, 317-331, 2013 | 105 | 2013 |
Hysteretic performance of a new blind bolted connection to concrete filled columns under cyclic loading: An experimental investigation W Tizani, ZY Wang, I Hajirasouliha Engineering structures 46, 535-546, 2013 | 98 | 2013 |
Experimental and numerical analysis of dynamic compressive response of Nomex honeycombs Y Zhang, T Liu, W Tizani Composites Part B: Engineering 148, 27-39, 2018 | 96 | 2018 |
Strength and initial stiffness of a blind-bolt connection based on the T-stub model ZY Wang, W Tizani, QY Wang Engineering structures 32 (9), 2505-2517, 2010 | 95 | 2010 |
Experimental behaviour of a novel anchored blind-bolt in tension T Pitrakkos, W Tizani Engineering Structures 49, 905-919, 2013 | 90 | 2013 |
Tensile capacity of FRP anchors in connecting FRP and TRM sheets to concrete DA Bournas, A Pavese, W Tizani Engineering Structures 82, 72-81, 2015 | 83 | 2015 |
The performance of a new blind-bolt for moment-resisting connections W Tizani, DJ Ridley-Ellis Tubular Structures X, 395-400, 2017 | 68 | 2017 |
The practice of blind bolting connections to structural hollow sections: A review. TC Barnett, W Tizani, DA Nethercot Steel & Composite Structures 1 (1), 1-16, 2001 | 55 | 2001 |
Blind bolted moment resisting connections to structural hollow sections T Barnett, W Tizani, DA Nethercot Connections in Steel Structures IV: Steel Connections in the New Millennium …, 2000 | 41 | 2000 |
Performance of T-stub to CFT joints using blind bolts with headed anchors W Tizani, T Pitrakkos Journal of Structural Engineering 141 (10), 04015001, 2015 | 39 | 2015 |
Advances and challenges in computing in civil and building engineering W Tizani, MJ Mawdesley Advanced Engineering Informatics 25 (4), 569-572, 2011 | 36 | 2011 |
Integrated parametric multi-level information and numerical modelling of mechanised tunnelling projects J Ninić, C Koch, A Vonthron, W Tizani, M König Advanced Engineering Informatics 43, 101011, 2020 | 35 | 2020 |
A component method model for blind-bolts with headed anchors in tension T Pitrakkos, W Tizani Steel and Composite Structures 18 (5), 2015 | 34 | 2015 |
Building information modelling (BIM)—Versioning for collaborative design AJ Zada, W Tizani, AH Oti Computing in Civil and Building Engineering (2014), 512-519, 2014 | 32 | 2014 |
Fire performance of blind-bolted connections to concrete filled tubular columns in tension AM Pascual, ML Romero, W Tizani Engineering Structures 96, 111-125, 2015 | 31 | 2015 |
A review and analysis of testing and modeling practice of extended Hollo-Bolt blind bolt connections M Cabrera, W Tizani, J Ninic Journal of Constructional Steel Research 183, 106763, 2021 | 28 | 2021 |
Experimental and numerical analysis of preload in Extended Hollo-Bolt blind bolts M Cabrera, W Tizani, J Ninic, F Wang Journal of Constructional Steel Research 186, 106885, 2021 | 27 | 2021 |
Behaviour of blind bolted connections to concrete filled hollow sections. S Ellison, W Tizani Structural Engineer 82 (22), 16-17, 2004 | 27 | 2004 |