Pesquisa operacional M Arenales, V Armentano Elsevier Brasil, 2006 | 568 | 2006 |
Genetic local search for multi-objective flowshop scheduling problems JEC Arroyo, VA Armentano European Journal of operational research 167 (3), 717-738, 2005 | 220 | 2005 |
Tabu search for total tardiness minimization in flowshop scheduling problems VA Armentano, DP Ronconi Computers & operations research 26 (3), 219-235, 1999 | 173 | 1999 |
Tabu search with path relinking for an integrated production–distribution problem VA Armentano, AL Shiguemoto, A Løkketangen Computers & Operations Research 38 (8), 1199-1209, 2011 | 166 | 2011 |
Evaluation of tropical water sources and mollusks in southern Brazil using microbiological, biochemical, and chemical parameters DSM Souza, APD Ramos, FF Nunes, V Moresco, S Taniguchi, DAG Leal, ... Ecotoxicology and environmental safety 76, 153-161, 2012 | 146* | 2012 |
Tardiness minimization in a flexible job shop: A tabu search approach CR Scrich, VA Armentano, M Laguna Journal of Intelligent Manufacturing 15 (1), 103-115, 2004 | 143 | 2004 |
Scatter search for project scheduling with resource availability cost DS Yamashita, VA Armentano, M Laguna European Journal of Operational Research 169 (2), 623-637, 2006 | 123 | 2006 |
A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines FMB Toledo, VA Armentano European Journal of Operational Research 175 (2), 1070-1083, 2006 | 116 | 2006 |
Tabu search for minimizing total tardiness in a job shop VA Armentano, CR Scrich International Journal of Production Economics 63 (2), 131-140, 2000 | 116 | 2000 |
The Pencil and Controllability–Observability for Generalized Linear Systems: a Geometric Approach VA Armentano SIAM journal on control and optimization 24 (4), 616-638, 1986 | 99 | 1986 |
Adaptive granular local search heuristic for a dynamic vehicle routing problem RM Branchini, VA Armentano, A Løkketangen Computers & Operations Research 36 (11), 2955-2968, 2009 | 98 | 2009 |
Lower bounding schemes for flowshops with blocking in-process DP Ronconi, VA Armentano Journal of the Operational Research Society 52 (11), 1289-1297, 2001 | 98 | 2001 |
Robust optimization models for project scheduling with resource availability cost DS Yamashita, VA Armentano, M Laguna Journal of Scheduling 10 (1), 67-76, 2007 | 91 | 2007 |
A heuristic for single machine scheduling with early and tardy costs R Mazzini, VA Armentano European Journal of Operational Research 128 (1), 129-146, 2001 | 91 | 2001 |
Eigenvalue placement for generalized linear systems VA Armentano Systems & control letters 4 (4), 199-202, 1984 | 89 | 1984 |
An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem VA Armentano, JE Claudio Journal of Heuristics 10 (5), 463-481, 2004 | 84 | 2004 |
A heuristic method for lot-sizing in multi-stage systems PM França, VA Armentano, RE Berretta, AR Clark Computers & operations research 24 (9), 861-874, 1997 | 81 | 1997 |
Tabu search for scheduling on identical parallel machines to minimize mean tardiness DS Yamashita Journal of intelligent manufacturing 11 (5), 453-460, 2000 | 77 | 2000 |
A genetic algorithm for scheduling on a single machine with set-up times and due dates VA Armentano, R Mazzini Production Planning & Control 11 (7), 713-720, 2000 | 71 | 2000 |
A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times AR Clark, VA Armentano Journal of the Operational research Society, 1208-1222, 1995 | 67 | 1995 |