Duration determination for rural roads using the principal component analysis and artificial neural network I Mensah, T Adjei-Kumi, G Nani Engineering, Construction and Architectural Management 23 (5), 638-656, 2016 | 26 | 2016 |
Development of a model for estimating the duration of bridge construction projects in Ghana I Mensah, G Nani, T Adjei-Kumi International Journal of Construction Engineering and Management 5 (2), 55-64, 2016 | 18 | 2016 |
Duration estimation model for bridge construction projects in Ghana TAK Gabriel Nani, Isaac Mensah Journal Engineering, Design and Technology 15 (6), 2017 | 10 | 2017 |
Methods of duration estimation at the Rural Road Agency in Ghana In: Laryea, S. and Leiringer R. (Eds) NG Mensah I, Adjei –Kumi T Proceedings of the 7th WABER Conference, 2017 | | 2017 |
A study of the factors causing delay of rural roads and bridge construction projects in Ghana NG Mensah I, Adjei –Kumi T Proceedings of the 7th WABER Conference, 2017 | | 2017 |
MODELS FOR FORECASTING THE DURATION FOR RURAL ROADS AND BRIDGE CONSTRUCTION PROJECTS IN GHANA I Mensah KWAME NKRUMAH UNIVERSITY OF SCIENCE AND TECHNOLOGY, KUMASI, GHANA, 2017 | | 2017 |
Forecasting the duration for small span bridge construction projects using the Artificial Neural Network In: Laryea GN I Mensah, T Adjei–Kumi Proceedings of the 6th West Africa Built Environment Research (WABER …, 2015 | | 2015 |
MODELLING CONSTRUCTION DURATION: A COMPREHENSIVE REVIEW OF LITERATURE I Mensah, G Nani, T Adjei-Kumi, E Adinyira Ashesi University College, Accra-Ghana, 6, 0 | | |