Aggregation heuristic for the open-pit block scheduling problem E Jélvez, N Morales, P Nancel-Penard, J Peypouquet, P Reyes European Journal of Operational Research 249 (3), 1169-1177, 2016 | 88 | 2016 |
Hardness and approximation of gathering in static radio networks JC Bermond, J Galtier, R Klasing, N Morales, S Perennes Parallel Processing Letters 16 (02), 165-183, 2006 | 85 | 2006 |
Incorporation of geometallurgical attributes and geological uncertainty into long-term open-pit mine planning N Morales, S Seguel, A Cáceres, E Jélvez, M Alarcón Minerals 9 (2), 108, 2019 | 62 | 2019 |
On the complexity of bandwidth allocation in radio networks R Klasing, N Morales, S Pérennes Theoretical Computer Science 406 (3), 225-239, 2008 | 49 | 2008 |
A simulation–optimization framework for short-term underground mine production scheduling F Manríquez, J Pérez, N Morales Optimization and Engineering 21, 939-971, 2020 | 37 | 2020 |
A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application E Jélvez, N Morales, P Nancel-Penard, F Cornillier Omega 94, 102046, 2020 | 32 | 2020 |
Stochastic open-pit mine production scheduling: A case study of an iron deposit M Maleki, E Jélvez, X Emery, N Morales Minerals 10 (7), 585, 2020 | 29 | 2020 |
Panel caving scheduling under precedence constraints considering mining system M Smoljanovic, E Rubio, N Morales 35th APCOM Symposium, Wollongong, NSW, Australia, 407-417, 2011 | 28 | 2011 |
A mathematical model for the scheduling and definition of mining cuts in short-term mine planning G Nelis, N Morales Optimization and Engineering 23 (1), 233-257, 2022 | 23 | 2022 |
A new model for automated pushback selection E Jélvez, N Morales, H Askari-Nasab Computers & Operations Research 115, 104456, 2020 | 21 | 2020 |
Open pit mine planning considering geomechanical fundamentals A Parra, N Morales, J Vallejos, PMV Nguyen International Journal of Mining, Reclamation and Environment 32 (4), 221-238, 2018 | 21 | 2018 |
Optimizing pushback design considering minimum mining width for open pit strategic planning P Nancel-Penard, N Morales Engineering Optimization 54 (9), 1494-1508, 2022 | 18 | 2022 |
Optimizing open-pit block scheduling with exposed ore reserve J Saavedra-Rosas, E Jeivez, J Amaya, N Morales Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016 | 17 | 2016 |
A two-stage stochastic model for open pit mine planning under geological uncertainty E Moreno, X Emery, M Goycoolea, N Morales, G Nelis Proceedings of the 38th International Symposium on the Application of …, 2017 | 16 | 2017 |
Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles F Manríquez, H González, N Morales Optimization and Engineering 24 (1), 681-707, 2023 | 15 | 2023 |
Value-optimal design of ramps in open pit mining P Nancel-Penard, A Parra, N Morales, C Díaz, E Widzyk-Capehart Archives of Mining Sciences, 399-413-399-413, 2019 | 14 | 2019 |
Footprint and economic envelope calculation for block/panel caving mines under geological uncertainty E Vargas, N Morales, X Emery | 14 | 2013 |
Gathering in specific radio networks JC Bermond, J Galtier, R Klasing, N Morales, S Pérennes AlgoTel'2006-8èmes Rencontres Francophones sur les Aspects Algorithmiques …, 2006 | 14 | 2006 |
A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine … P Nancel-Penard, N Morales, F Cornillier European Journal of Operational Research 303 (3), 1088-1099, 2022 | 13 | 2022 |
Comparison of different approaches to strategic open-pit mine planning under geological uncertainty G Nelis, N Morales, E Widzyk-Capehart Proceedings of the 27th International Symposium on Mine Planning and …, 2019 | 13 | 2019 |