Follow
František Koblasa
František Koblasa
Technical university in Liberec
Verified email at tul.cz
Title
Cited by
Cited by
Year
The use of process thinking in the industrial practice–Preliminary survey
F Koblasa, E Šírová, R Králíková
Tehnički vjesnik 26 (3), 786-792, 2019
182019
Innovation of business processes by means of computer-aided simulation
F Manlig, E Šlaichová, F Koblasa, J Vavruška
Applied Mechanics and Materials 474, 67-72, 2014
162014
Evolution algorithm for job shop scheduling problem constrained by the optimization timespan
F Koblasa, F Manlig, J Vavruška
Applied Mechanics and Materials 309, 350-357, 2013
122013
Heuristic Approach as a way to Improve Scheduling in ERP/APS Systems
F Koblasa, LS Dias, JA Oliveira, G Pereira
Proceedings of 15th European Concurrent Engineering Conference (ECEC2008 …, 2008
102008
Solving job shop scheduling with the computer simulation
T Kloud, F Koblasa
Transport & Logistics. 9th Special, 775-785, 2011
92011
Approaches to the evaluation of workshop microclimate conditions
R Králiková, F Koblasa
MM Science Journal, 2397-2400, 2018
82018
Influence of EA control parameters to optimization process of FJSSP problem
F Koblasa, R Kralikova, R Votrubec
International Journal of Simulation Modelling 19 (3), 387-398, 2020
62020
MAN-MACHINE-ENVIRONMENT SYSTEM ANALYSES AND IMPACT OF ENVIRONMENT FACTORS TO PRODUCTIVITY AND HEALTH OF EMPLOYEES.
R Kralikova, L Dzunova, M Pinosova, E Wessely, F Koblasa
Annals of DAAAM & Proceedings 30, 2019
52019
Two-dimensional bin packing problem in batch scheduling
F Koblasa, M Vavroušek, F Manlig
Proceedings of 33rd International Conference Mathematical Methods in …, 2015
52015
Design of simulation experiments using DOE
F Manlig, F Koblasa
Applied Mechanics and Materials 693, 219-224, 2014
52014
Job shop scheduling problem with multi-shift work system
F Koblasa, F Manlig
ACC Journal 15, 15-23, 2009
52009
ENVIRONMENTAL AND HEALTH IMPACT OF PAINT PRODUCTS.
R Kralikova, M Pinosova, F Koblasa, E Wessely, M Rusko
Annals of DAAAM & Proceedings, 2020
42020
Control System of Vehicle for Smart Factory Model with Principles of Industry 4.0
R Votrubec, F Koblasa
Proceedings of the 30th DAAAM International Symposium, 0261-0267, 2019
42019
Bin packing and scheduling with due dates
F Koblasa, M Vavroušek
36th International Conference on Mathematical Methods in Economics, 2018
32018
The experiences with reengineering using computer simulation
F Manlig, O Lada, F Koblasa
DAAAM International Scientific Book, Vienna, 555-562, 2011
32011
Simulation and possibility of optimization in ERP/APS systems
F Koblasa, LS Dias, JA Oliveira
Proceedings of 4th annual International conference for Ph. D students and …, 2008
32008
Scheduling optimization using local search and genetic algorithm
F Koblasa, L Dias, JA Oliveira
Technical University of Liberec, 2008
32008
Systémy plánování a řízení výroby
F Koblasa
Liberec,[2012][cit. 2012-12-11]. Dostupné z: educom. tul. cz/getFile/case …, 0
3
Influence of Lighting Maintenance on The Energy Consumption
R Kralikova, E Wessely, F Koblasa
Annals of DAAAM & Proceedings 29, 0109-0118, 2018
22018
Three-dimensional Bin Packing Problem with heterogeneous batch constraints.
F Koblasa, M Vavroušek, F Manlig
35th International Conference Mathematical Methods in Economics, 330-335, 2017
22017
The system can't perform the operation now. Try again later.
Articles 1–20