Seguir
Thiago Cantos Lopes
Thiago Cantos Lopes
E-mail confirmado em alunos.utfpr.edu.br
Título
Citado por
Citado por
Ano
Balancing a robotic spot welding manufacturing line: An industrial case study
TC Lopes, CGS Sikora, RG Molina, D Schibelbain, LCA Rodrigues, ...
European Journal of Operational Research 263 (3), 1033-1048, 2017
772017
Traveling worker assembly line (re) balancing problem: Model, reduction techniques, and real case studies
CGS Sikora, TC Lopes, L Magatão
European Journal of Operational Research 259 (3), 949-971, 2017
752017
A Benders’ decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem
AS Michels, TC Lopes, CGS Sikora, L Magatão
European Journal of Operational Research 278 (3), 796-808, 2019
552019
Flexible multi-manned assembly line balancing problem: Model, heuristic procedure, and lower bounds for line length minimization
TC Lopes, GV Pastre, AS Michels, L Magatão
Omega 95, 102063, 2020
412020
An iterative decomposition for asynchronous mixed-model assembly lines: combining balancing, sequencing, and buffer allocation
TC Lopes, CGS Sikora, AS Michels, L Magatão
International Journal of Production Research 58 (2), 615-630, 2020
392020
The Robotic Assembly Line Design (RALD) problem: Model and case studies with practical extensions
AS Michels, TC Lopes, CGS Sikora, L Magatão
Computers & Industrial Engineering 120, 320-333, 2018
372018
Balancing and cyclical scheduling of asynchronous mixed-model assembly lines with parallel stations
TC Lopes, AS Michels, CGS Sikora, L Magatão
Journal of Manufacturing Systems 50, 193-200, 2019
312019
Mixed-model assembly lines balancing with given buffers and product sequence: model, formulation comparisons, and case study
TC Lopes, CGS Sikora, AS Michels, L Magatão
Annals of Operations Research 286 (1), 475-500, 2020
302020
Balancing and cyclically sequencing synchronous, asynchronous, and hybrid unpaced assembly lines
TC Lopes, AS Michels, CGS Sikora, RG Molina, L Magatão
International Journal of Production Economics 203, 216-224, 2018
272018
A simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly lines
TC Lopes, AS Michels, R Lüders, L Magatão
Computers & Operations Research 115, 104863, 2020
242020
An exact method with decomposition techniques and combinatorial Benders’ cuts for the type-2 multi-manned assembly line balancing problem
AS Michels, TC Lopes, L Magatão
Operations Research Perspectives 7, 100163, 2020
212020
Integer based formulation for the simple assembly line balancing problem with multiple identical tasks
CGS Sikora, TC Lopes, D Schibelbain, L Magatao
Computers & Industrial Engineering 104, 134-144, 2017
132017
Assembly line balancing with fractional task allocations
TC Lopes, N Brauner, L Magatão
International Journal of Production Research 60 (5), 1569-1586, 2022
102022
Assembly line balancing for two cycle times: Anticipating demand fluctuations
TC Lopes, AS Michels, CGS Sikora, N Brauner, L Magatão
Computers & Industrial Engineering 162, 107685, 2021
92021
Genetic algorithm for type-2 assembly line balancing
CGS Sikora, TC Lopes, HS Lopes, L Magatão
2015 Latin America Congress on Computational Intelligence (LA-CCI), 1-6, 2015
92015
A note to: A hybrid algorithm for allocating tasks, operators, and workstations in multi-manned assembly lines
TC Lopes, AS Michels, L Magatao
Journal of Manufacturing Systems 52, 205-208, 2019
72019
Buffer and cyclical product sequence aware assembly line balancing problem: Model and steady-state balancing case study
TC Lopes, CGS Sikora, L Magatao
Annals of the XLVIII SBPO, Vitória-ES, Brazil, 3458-3469, 2016
72016
Variable Sets Reduction for Assembly Line Balancing Problem: MILP Model and Case Studies
CGS Sikora, TC Lopes, L Magatao
Simpósio Brasileiro de Pesquisa Operacional, 166-176, 2015
32015
An MILP formulation for robotic assembly line design with parallel stations, dead time and equipment selection
TC Lopes, AS Michels, RG Molina, CGS Sikora, L Magatao
Proc. of XLIII SBPO, Vitória-ES, Brazil, 3256-3257, 2016
22016
Balancing-sequencing paced assembly lines: a multi-objective mixed-integer linear case study
TC Lopes, AS Michels, N Brauner, L Magatão
International Journal of Production Research 61 (17), 5901-5917, 2023
12023
O sistema não pode executar a operação agora. Tente novamente mais tarde.
Artigos 1–20