Seguir
CARLOS ALBERTO PEREIRA SOARES
CARLOS ALBERTO PEREIRA SOARES
E-mail confirmado em id.uff.br
Título
Citado por
Citado por
Ano
Fundamentos para o Gerenciamento de Projetos
AB Valle, Soares, Carlos Alberto Pereir, JF Junior, LSF Silva
310*2010
The project manager core competencies to project success
JC Alvarenga, RR Branco, ALA Guedes, CAP Soares, WS Silva
International journal of managing projects in Business 13 (2), 277-292, 2020
2702020
Image-based crack detection methods: A review
HS Munawar, AWA Hammad, A Haddad, CAP Soares, ST Waller
Infrastructures 6 (8), 115, 2021
1582021
Smart cities: The main drivers for increasing the intelligence of cities
AL Azevedo Guedes, J Carvalho Alvarenga, M Dos Santos Sgarbi Goulart, ...
Sustainability 10 (9), 3121, 2018
1542018
Smart buildings: Systems and drivers
MM Froufe, CK Chinelli, ALA Guedes, AN Haddad, AWA Hammad, ...
Buildings 10 (9), 153, 2020
952020
Smart and sustainable cities: The main guidelines of city statute for increasing the intelligence of Brazilian cities
EG Lima, CK Chinelli, ALA Guedes, EG Vazquez, AWA Hammad, ...
Sustainability 12 (3), 1025, 2020
842020
Smart mobility: The main drivers for increasing the intelligence of urban mobility
PA Maldonado Silveira Alonso Munhoz, F da Costa Dias, ...
Sustainability 12 (24), 10675, 2020
772020
Multiple dimensions of smart cities’ infrastructure: A review
APP Kasznar, AWA Hammad, M Najjar, E Linhares Qualharini, ...
Buildings 11 (2), 73, 2021
592021
Implementation of a project management office in a public sector organization: A case study involving a sanitation institution
JC Esquierro, AB Valle, CAP Soares, DC Vivas
International Review of Management and marketing 4 (1), 1-12, 2014
352014
Barriers and challenges to the sustainability requirements implementation in public procurement of engineering works and services
CT de Souza Dutra, U Rohan, RR Branco, CK Chinelli, AJVB de Araujo, ...
Open Journal of Civil Engineering 7 (1), 1-13, 2017
312017
The use of earned value analysis (EVA) in the cost management of construction projects
JA Valle, CAP Soares
Proc., Project Management Institute Global Congress, Newtown Square, PA, 1-11, 2006
312006
The use of unmanned aerial vehicles for dynamic site layout planning in large-scale construction projects
AWA Hammad, BBF da Costa, CAP Soares, AN Haddad
Buildings 11 (12), 602, 2021
302021
Post-disaster housing recovery guidelines for development countries based on experiences in the American continent
LT Di Gregorio, CAP Soares
International journal of disaster risk reduction 24, 340-347, 2017
292017
BIM and BEM methodologies integration in energy-efficient buildings using experimental design
J González, CAP Soares, M Najjar, AN Haddad
Buildings 11 (10), 491, 2021
282021
Application of fuzzy-TOPSIS method in supporting supplier selection with focus on HSE criteria: A case study in the oil and gas industry
AN Haddad, BBF da Costa, LS de Andrade, A Hammad, CAP Soares
Infrastructures 6 (8), 105, 2021
272021
Project management office (PMO)-Principles in practice
JAS Do Valle, WS e Silvia, CAP Soares
AACE International Transactions, PM71, 2008
272008
A revaluation of the criticality of the project manager to the project’s success
JC Alvarenga, RR Branco, AB do Valle, CAP Soares, ...
Business management dynamics 8 (2), 1-18, 2018
222018
Sustainability indicators to assess infrastructure projects: Sector disclosure to interlock with the global reporting initiative
RPF Ferrarez, RV Vargas, JC Alvarenga, CK Chinelli, ...
Engineering Journal 24 (6), 43-61, 2020
192020
Panorama da complexidade: principais correntes, definições e constructos
AP Lukosevicius, GG Marchisotti, CAP Soares
Sistemas & Gestão 11 (4), 455-465, 2016
192016
Oil spill simulation and analysis of its behavior under the effect of weathering and chemical dispersant: a case study of the Bacia de Campos—Brazil
DHA Torres, F da Costa Dias, BR Bahiana, AN Haddad, CK Chinelli, ...
Water, Air, & Soil Pollution 231 (10), 521, 2020
182020
O sistema não pode executar a operação agora. Tente novamente mais tarde.
Artigos 1–20