Debora P. Ronconi
Debora P. Ronconi
Department of Production Engineering, University of São Paulo
Verified email at usp.br - Homepage
Title
Cited by
Cited by
Year
A note on constructive heuristics for the flowshop problem with blocking
DP Ronconi
International Journal of Production Economics 87 (1), 39-48, 2004
1972004
Tabu search for total tardiness minimization in flowshop scheduling problems
VA Armentano, DP Ronconi
Computers & operations research 26 (3), 219-235, 1999
1731999
Optimizing the packing of cylinders into a rectangular container: a nonlinear approach
EG Birgin, JM Martınez, DP Ronconi
European Journal of Operational Research 160 (1), 19-33, 2005
1582005
A branch-and-bound algorithm to minimize the makespan in a flowshop with blocking
DP Ronconi
Annals of Operations Research 138 (1), 53-65, 2005
1282005
Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
CM Hino, DP Ronconi, AB Mendes
European Journal of Operational Research 160 (1), 190-201, 2005
1252005
Some heuristic algorithms for total tardiness minimization in a flowshop with blocking
DP Ronconi, LRS Henriques
Omega 37 (2), 272-281, 2009
1022009
Lower bounding schemes for flowshops with blocking in-process
DP Ronconi, VA Armentano
Journal of the Operational Research Society 52 (11), 1289-1297, 2001
982001
Orthogonal packing of rectangular items within arbitrary convex regions by nonlinear optimization
EG Birgin, JM Martínez, FH Nishihara, DP Ronconi
Computers & Operations Research 33 (12), 3535-3548, 2006
652006
A MILP model for an extended version of the Flexible Job Shop Problem
EG Birgin, P Feofiloff, CG Fernandes, EL De Melo, MTI Oshiro, ...
Optimization Letters 8 (4), 1417-1431, 2014
492014
Mixed-integer programming models for flowshop scheduling problems minimizing the total earliness and tardiness
DP Ronconi, EG Birgin
Just-in-Time systems, 91-105, 2012
482012
Optimizing transportation and storage of final products in the sugar and ethanol industry: a case study
MS Kawamura, DP Ronconi, H Yoshizaki
International Transactions in Operational Research 13 (5), 425-439, 2006
452006
List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility
EG Birgin, JE Ferreira, DP Ronconi
European Journal of Operational Research 247 (2), 421-440, 2015
382015
The single machine earliness and tardiness scheduling problem: lower bounds and a branch-and-bound algorithm
DP Ronconi, MS Kawamura
Computational & applied mathematics 29 (2), 107-124, 2010
382010
Method of sentinels for packing items within arbitrary convex regions
EG Birgin, JM Martínez, WF Mascarenhas, DP Ronconi
Journal of the Operational Research Society 57 (6), 735-746, 2006
322006
Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date
CS Sakuraba, DP Ronconi, F Sourd
Computers & Operations Research 36 (1), 60-72, 2009
302009
Minimização do tempo total de atraso no problema de flowshop com buffer zero através de busca tabu
VA Armentano, DP Ronconi
Gestão & Produção 7 (3), 352-363, 2000
292000
New heuristics for total tardiness minimization in a flexible flowshop
GB Mainieri, DP Ronconi
Optimization Letters 7 (4), 665-684, 2013
232013
Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming
DP Ronconi, WB Powell
Journal of Scheduling 13 (6), 597-607, 2010
212010
A biased random key genetic algorithm for the field technician scheduling problem
RB Damm, MGC Resende, DP Ronconi
Computers & Operations Research 75, 49-63, 2016
182016
MIP models for two-dimensional non-guillotine cutting problems with usable leftovers
R Andrade, EG Birgin, R Morabito, DP Ronconi
Journal of the Operational Research Society 65 (11), 1649-1663, 2014
182014
The system can't perform the operation now. Try again later.
Articles 1–20