Follow
Débora P. Ronconi
Débora P. Ronconi
Department of Production Engineering, University of São Paulo
Verified email at usp.br - Homepage
Title
Cited by
Cited by
Year
A note on constructive heuristics for the flowshop problem with blocking
DP Ronconi
International Journal of Production Economics 87 (1), 39-48, 2004
2392004
Optimizing the packing of cylinders into a rectangular container: A nonlinear approach
EG Birgin, JM Martınez, DP Ronconi
European Journal of Operational Research 160 (1), 19-33, 2005
1872005
Tabu search for total tardiness minimization in flowshop scheduling problems
VA Armentano, DP Ronconi
Computers & operations research 26 (3), 219-235, 1999
1851999
A branch-and-bound algorithm to minimize the makespan in a flowshop with blocking
DP Ronconi
Annals of Operations Research 138, 53-65, 2005
1472005
Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
CM Hino, DP Ronconi, AB Mendes
European Journal of Operational Research 160 (1), 190-201, 2005
1422005
Lower bounding schemes for flowshops with blocking in-process
DP Ronconi, VA Armentano
Journal of the Operational Research Society 52 (11), 1289-1297, 2001
1162001
Some heuristic algorithms for total tardiness minimization in a flowshop with blocking
DP Ronconi, LRS Henriques
Omega 37 (2), 272-281, 2009
1122009
A MILP model for an extended version of the flexible job shop problem
EG Birgin, P Feofiloff, CG Fernandes, EL De Melo, MTI Oshiro, ...
Optimization Letters 8, 1417-1431, 2014
952014
Orthogonal packing of rectangular items within arbitrary convex regions by nonlinear optimization
EG Birgin, JM Martínez, FH Nishihara, DP Ronconi
Computers & Operations Research 33 (12), 3535-3548, 2006
742006
List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility
EG Birgin, JE Ferreira, DP Ronconi
European Journal of Operational Research 247 (2), 421-440, 2015
732015
Mixed-integer programming models for flowshop scheduling problems minimizing the total earliness and tardiness
DP Ronconi, EG Birgin
Just-in-Time systems, 91-105, 2012
732012
Mixed integer linear programming and constraint programming models for the online printing shop scheduling problem
WT Lunardi, EG Birgin, P Laborie, DP Ronconi, H Voos
Computers & Operations Research 123, 105020, 2020
632020
Optimizing transportation and storage of final products in the sugar and ethanol industry: a case study
MS Kawamura, DP Ronconi, H Yoshizaki
International Transactions in Operational Research 13 (5), 425-439, 2006
552006
The single machine earliness and tardiness scheduling problem: lower bounds and a branch-and-bound algorithm
DP Ronconi, MS Kawamura
Computational & applied mathematics 29, 107-124, 2010
462010
A biased random key genetic algorithm for the field technician scheduling problem
RB Damm, MGC Resende, DP Ronconi
Computers & Operations Research 75, 49-63, 2016
402016
Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming
DP Ronconi, WB Powell
Journal of Scheduling 13 (6), 597-607, 2010
372010
Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date
CS Sakuraba, DP Ronconi, F Sourd
Computers & Operations Research 36 (1), 60-72, 2009
352009
Method of sentinels for packing items within arbitrary convex regions
EG Birgin, JM Martínez, WF Mascarenhas, DP Ronconi
Journal of the Operational Research Society 57 (6), 735-746, 2006
332006
Minimização do tempo total de atraso no problema de flowshop com buffer zero através de busca tabu
VA Armentano, DP Ronconi
Gestão & Produção 7, 352-363, 2000
332000
Metaheuristics for the online printing shop scheduling problem
WT Lunardi, EG Birgin, DP Ronconi, H Voos
European Journal of Operational Research 293 (2), 419-441, 2021
312021
The system can't perform the operation now. Try again later.
Articles 1–20