Follow
Emerson de Andrade Marques Ferreira
Emerson de Andrade Marques Ferreira
Verified email at ufba.br
Title
Cited by
Cited by
Year
Metodologia para elaboração do projeto do canteiro de obras de edifícios
EAM Ferreira, LS Franco
São Paulo, 1998
591998
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
DM Brito, EAM Ferreira
Ambiente construido 15 (4), 203-223, 2015
432015
Strategies for representation and analyses of 4D modeling applied to construction project management
DM Brito, EAM Ferreira
Procedia Economics and Finance 21, 374-382, 2015
312015
Framework for Building Information Modeling Adoption Based on Critical Success Factors from Brazilian Public Organizations
DM Brito, EAM Ferreira, DB Costa
Journal of Construction Engineering and Management 147 (7), 05021004, 2021
232021
Conceptual Framework for Tracking Metallic Formworks on Construction Sites Using IoT, RFID and BIM Technologies
CS Araújo, LC de Siqueira, EAM Ferreira, DB Costa
International Conference on Computing in Civil and Building Engineering, 865-878, 2020
132020
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
AVS Melo, EAM Ferreira, DB Costa
Ambiente Construído 13 (3), 99-115, 2013
112013
A aplicação da metodologia bim para a compatibilização de projetos
TS de Sena, EAM Ferreira
Monografia apresentada ao Curso de Engenharia Civil, Escola Politécnica …, 2012
92012
Conceptual Framework for Integrating Cost Estimating and Scheduling with BIM
MCF Santos, DB Costa, EAM Ferreira
International Conference on Computing in Civil and Building Engineering, 613-625, 2020
82020
Proposta de uma Metodologia para o Projeto do Canteiro de Obras
EAM FERREIRA, LS FRANCO
CONGRESSO LATINO-AMERICANO TECNOLOGIA E GESTÃO NA PRODUÇÃO DE EDIFÍCIOS …, 1998
81998
Digital Twins and Lean Construction: Challenges for Future Practical Applications
CS Araújo, DB Costa, FR Corrêa, EAM Ferreira
Proceedings of the 30th Annual Conference of the International Group for …, 2022
62022
Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
MCF Santos, DB Costa, EAM Ferreira
Ambiente Construído 21 (2), 113-129, 2021
62021
Digital twins to monitor physical resources at construction sites with web application
EAM Ferreira, BSVB de Jesus, CS Araújo, YCM Rodrigues, DB Costa
AIP Conference Proceedings 2428 (1), 2021
52021
The Integrated Project for the Redevelopment of a Historic Building: An Example of BIM and IoT Integration to Manage the Comfort of the Building
L Baiardi, EAM Ferreira
Impact of Industry 4.0 on Architecture and Cultural Heritage, 261-282, 2020
52020
What do we mean by corporate social responsibility in the construction sector
L Leao-Aguiar, EAM Ferreira, MMO Marinho
Conference on Sustainable Building South East Asia 11, 13, 2005
52005
Diretrizes para a seleção e avaliação de sistemas construtivos com base nos princípios da produção “enxuta” e da produção “limpa”
EAM FERREIRA, TM FREIRE
III WORKSHOP BRASILEIRO DE GESTÃO DO PROCESSO DE PROJETO NA CONSTRUÇÃO DE …, 2003
52003
BIM and IoT integration to support management processes: An application for precast concrete systems
CM Lima, EAM Ferreira, JL Calmon
The Journal of Modern Project Management 9 (2), 2021
42021
Projeto de Canteiro de Obras com o auxílio de ferramentas BIM
CF Costa, EAM Ferreira
SIMPÓSIO BRASILEIRO DE TECNOLOGIA DE INFORMAÇÃO E COMUNICAÇÃO NA CONSTRUÇÃO …, 2019
42019
Code Checking using BIM for Digital Building Permit: a case study in a Brazilian municipality
DM Brito, DB Costa, EAM Ferreira
IOP Conference Series: Earth and Environmental Science 1101 (2), 022049, 2022
32022
Criação Automática de EAP em BIM a partir de programação visual computacional
EAM FERREIRA, CF COSTA, LJR ROSA, CSO PASSOS, RLM PINTO
SIBRAGEC-SBTIC. Fortaleza, 2017
32017
Desafios e oportunidades para implantação de BIM pelo setor público brasileiro
DM BRITO, EAM FERREIRA, DB COSTA
1º Simpósio Brasileiro de Tecnologia da Informação e Comunicação na Constr …, 2017
32017
The system can't perform the operation now. Try again later.
Articles 1–20