Seguir
Fernanda Saidelles Bataglin
Fernanda Saidelles Bataglin
E-mail confirmado em ufrgs.br
Título
Citado por
Citado por
Ano
Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM
FS Bataglin, DD Viana, CT Formoso, IR Bulhões
Canadian journal of civil engineering 47 (2), 165-177, 2020
572020
Application of BIM for supporting decision-making related to logistics in prefabricated building systems
FS Bataglin, DD Viana, CT Formoso, IR Bulhões
Proceedings of the 25th Annual Conference of the International Group for …, 2017
272017
BIM 4D aplicado à gestão logística: implementação na montagem de sistemas pré-fabricados de concreto engineer-to-order
FS Bataglin, DD Viana, CT Formoso, IR Bulhões
Ambiente Construído 18, 173-192, 2018
202018
Guidelines for integrated production control in engineer-to-order prefabricated concrete building systems: preliminary results
GA Peñaloza, DD Viana, FS Bataglin, CT Formoso, IR Bulhões
Conf. of the Int’l. Group for Lean Construction. Boston, MA, USA, sect, 103-112, 2016
192016
Guidelines to develop a BIM model focused on construction planning and control
FB De Vargas, FS Bataglin, CT Formoso
Proceedings of the 26th Annual Conference of the International Group for …, 2018
132018
Slack in construction-Part 1: Core concepts
C Formoso, ID Tommelein, TA Saurin, L Koskela, M Fireman, K Barth, ...
Proc. 29th Annual Conference of the International Group for Lean …, 2021
72021
Diretrizes para a definição de lotes de montagem de sistemas pré-fabricados de concreto do tipo engineer-to-order
RH Reck, FS Bataglin, CT Formoso, KB Barth, T Diepenbruck, EL Isatto
Ambiente Construído 20, 105-127, 2019
62019
Requirements for developing production planning and control systems for engineer-to-order industrialized building systems
DD Viana, CT Formoso, FS Bataglin
Construction Management and Economics 40 (7-8), 638-652, 2022
52022
4D BIM applied to logistics management: implementation in the assembly of Engineer-to-order prefabricated concrete systems
FS Bataglin, DD Viana, CT Formoso, IR Bulhões
Ambiente Construído 18, 173-192, 2018
42018
modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados engineer-to-order
FS Bataglin
42017
Design Principles and Prescriptions for Planning and Controlling Engineer-to-Order Industrialized Building Systems
FS Bataglin, DD Viana, CT Formoso
Sustainability 14 (24), 16822, 2022
32022
Uso da Simulação Bim 4D para Apoio à Gestão dos Processos Logísticos em Obras de Sistemas Pré-fabricados de Concreto
FS BATAGLIN, DD Viana, GA Peñaloza, AJ Smolinski, CT Formoso, ...
XVI ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 2016
22016
Buffer Types and Methods of Deployment in Construction
FS Bataglin, DD Viana, RV Coelho, ID Tommelein, CT Formoso
Proc. 29th Annual Conference of the International Group for Lean …, 2021
12021
Slack in construction-Part 2: Practical applications
TA Saurin, DD Viana, CT Formoso, ID Tommelein, L Koskela, M Fireman, ...
Proc. 29th Annual Conference of the International Group for Lean …, 2021
12021
O sistema não pode executar a operação agora. Tente novamente mais tarde.
Artigos 1–14