Follow
Sylvain Kubicki
Sylvain Kubicki
Lead Research and Technology Associate, Luxembourg Institute of Science and Technology
Verified email at list.lu
Title
Cited by
Cited by
Year
Towards a semantic Construction Digital Twin: Directions for future research
C Boje, A Guerriero, S Kubicki, Y Rezgui
Automation in construction 114, 103179, 2020
11012020
Review of building energy performance certification schemes towards future improvement
Y Li, S Kubicki, A Guerriero, Y Rezgui
Renewable and Sustainable Energy Reviews 113, 109244, 2019
2712019
Optimizing energy efficiency in operating built environment assets through building information modeling: A case study
I Petri, S Kubicki, Y Rezgui, A Guerriero, H Li
Energies 10 (8), 1167, 2017
1172017
The challenge of level of development in 4D/BIM simulation across AEC project lifecyle. A case study
C Boton, S Kubicki, G Halin
Procedia Engineering 123, 59-67, 2015
1102015
The application of life cycle assessment in buildings: challenges, and directions for future research
A Fnais, Y Rezgui, I Petri, T Beach, J Yeung, A Ghoroghi, S Kubicki
The International Journal of Life Cycle Assessment 27 (5), 627-654, 2022
922022
Designing adapted visualization for collaborative 4D applications
C Boton, S Kubicki, G Halin
Automation in Construction 36, 152-167, 2013
752013
BIM-enhanced collaborative smart technologies for LEAN construction processes
A Guerriero, S Kubicki, F Berroir, C Lemaire
2017 International Conference on Engineering, Technology and Innovation (ICE …, 2017
592017
Assessment of synchronous interactive devices for BIM project coordination: Prospective ergonomics approach
S Kubicki, A Guerriero, L Schwartz, E Daher, B Idris
Automation in Construction 101, 160-178, 2019
532019
Assistance to building construction coordination–towards a multi-view cooperative platform
S Kubicki, JC Bignon, G Halin, P Humbert
Electronic Journal of Information Techonology in Construction, On Process …, 2006
512006
Promoting energy efficiency in the built environment through adapted bim training and education
A Alhamami, I Petri, Y Rezgui, S Kubicki
Energies 13 (9), 2308, 2020
502020
A framework using BIM and digital twins in facilitating LCSA for buildings
C Boje, ÁJH Menacho, A Marvuglia, E Benetto, S Kubicki, T Schaubroeck, ...
Journal of Building Engineering 76, 107232, 2023
442023
Assister la coordination flexible de l'activité de construction de bâtiments. Une approche par les modèles pour la proposition d'outils de visualisation du contexte de coopération.
S Kubicki
Université Henri Poincaré-Nancy I, 2006
372006
Development of an adaptation table to enhance the accuracy of the predicted mean vote model
Y Li, Y Rezgui, A Guerriero, X Zhang, M Han, S Kubicki, D Yan
Building and Environment 168, 106504, 2020
332020
A service-based innovation process for improving cooperative practices in AEC
S Kubicki, A Guerriero, L Johannsen
Journal of Information Technology in Construction (ITcon) 14 (43), 654-673, 2009
322009
Maturité des pratiques BIM: Dimensions de modélisation, pratiques collaboratives et technologies
C Boton, S Kubicki
SCAN'14, 6ème Séminaire de Conception Architecturale Numérique, 45-56, 2014
292014
Data-driven development in the smart city: Generative design for refugee camps in Luxembourg
E Daher, S Kubicki, A Guerriero
Entrepreneurship and Sustainability Issues 4 (3), 364, 2017
282017
Challenges of big data in the age of building information modeling: a high-level conceptual pipeline
C Boton, G Halin, S Kubicki, D Forgues
Cooperative Design, Visualization, and Engineering: 12th International …, 2015
252015
4D/BIM simulation for pre-construction and construction scheduling. Multiple levels of development within a single case study
C Boton, S Kubicki, G Halin
Diamond Congress Ltd, 2015
242015
4D-based teaching of high-rise structural principles
S Kubicki, C Boton
CIB W078 Conference 2011, w78-2011-72, 2011
192011
An intelligent semantic system for real-time demand response management of a thermal grid
Y Li, Y Rezgui, S Kubicki
Sustainable Cities and Society 52, 101857, 2020
182020
The system can't perform the operation now. Try again later.
Articles 1–20