Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives I Cohen, A Mandelbaum, A Shtub Project management journal 35 (2), 39-50, 2004 | 195 | 2004 |
The biggest business process management problems to solve before we die I Beerepoot, C Di Ciccio, HA Reijers, S Rinderle-Ma, W Bandara, ... Computers in Industry 146, 103837, 2023 | 130 | 2023 |
A robust optimization approach for the multi-mode resource-constrained project scheduling problem N Balouka, I Cohen European journal of operational research 291 (2), 457-470, 2021 | 102 | 2021 |
The stochastic time–cost tradeoff problem: a robust optimization approach I Cohen, B Golany, A Shtub Networks: An International Journal 49 (2), 175-188, 2007 | 90 | 2007 |
Cross-entropy method’ DP Kroese, RY Rubinstein, I Cohen, S Porotsky, T Taimre European Journal of Operational Research 31, 276-283, 2011 | 70 | 2011 |
Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology I Cohen, B Golany, A Shtub Annals of Operations Research 134, 183-199, 2005 | 68 | 2005 |
Assessment of fatigue striation counting accuracy using high resolution scanning electron microscope E Hershko, N Mandelker, G Gheorghiu, H Sheinkopf, I Cohen, O Levy Engineering Failure Analysis 15 (1-2), 20-27, 2008 | 54 | 2008 |
Improving time-critical decision making in life-threatening situations: Observations and insights I Cohen Decision Analysis 5 (2), 100-110, 2008 | 47 | 2008 |
Bed blocking in hospitals due to scarce capacity in geriatric institutions—cost minimization via fluid models N Zychlinski, A Mandelbaum, P Momčilović, I Cohen Manufacturing & Service Operations Management 22 (2), 396-411, 2020 | 42 | 2020 |
A simulation‐based approach in support of project management training for systems engineers I Cohen, M Iluz, A Shtub Systems Engineering 17 (1), 26-36, 2014 | 38 | 2014 |
Nickel–aluminide coating of TiAl by a two-stage process A Katsman, A Ginzburg, T Werber, I Cohen, L Levin Surface and coatings technology 127 (2-3), 219-222, 2000 | 38 | 2000 |
On the discretized dubins traveling salesman problem I Cohen, C Epstein, T Shima IISE Transactions 49 (2), 238-254, 2017 | 33 | 2017 |
The use of SIMS in quality control and failure analysis of electrodeposited items inspected for hydrogen effects E Kossoy, Y Khoptiar, C Cytermann, G Shemesh, H Katz, H Sheinkopf, ... Corrosion science 50 (5), 1481-1491, 2008 | 33 | 2008 |
Minimizing mortality in a mass casualty event: fluid networks in support of modeling and staffing I Cohen, A Mandelbaum, N Zychlinski IIE Transactions 46 (7), 728-741, 2014 | 32 | 2014 |
An objective-based entropy approach for interpretable decision tree models in support of human resource management: The case of absenteeism at work. G Singer, I Cohen Entropy 22 (8), 821-835, 2020 | 26 | 2020 |
Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology I Cohen, B Golany, A Shtub Journal of Scheduling 10, 181-193, 2007 | 26 | 2007 |
Extending the multimode resource-constrained project scheduling problem by including value considerations N Balouka, I Cohen, A Shtub IEEE Transactions on Engineering Management 63 (1), 4-15, 2016 | 25 | 2016 |
Discretization-based and look-ahead algorithms for the dubins traveling salesperson problem I Cohen, C Epstein, P Isaiah, S Kuzi, T Shima IEEE Transactions on Automation Science and Engineering 14 (1), 383-390, 2016 | 21 | 2016 |
When cost–effective design strategies are not enough: Evidence from an experimental study on the role of redundant goals I Cohen, M Iluz Omega 56, 99-111, 2015 | 20 | 2015 |
Conformance Checking Over Stochastically Known Logs E Bogdanov, I Cohen, A Gal Lecture Notes in Business Information Processing 458, 105-119, 2022 | 17 | 2022 |