Seguir
M. T. Yazdani Sabouni
Título
Citado por
Citado por
Ano
Optimal methods for batch processing problem with makespan and maximum lateness objectives
MTY Sabouni, F Jolai
Applied Mathematical Modelling 34 (2), 314-324, 2010
522010
Carryover sequence-dependent group scheduling with the integration of internal and external setup times
MTY Sabouni, R Logendran
European Journal of Operational Research 224 (1), 8-22, 2013
302013
A single machine carryover sequence-dependent group scheduling in PCB manufacturing
MTY Sabouni, R Logendran
Computers & operations research 40 (1), 236-247, 2013
192013
Lower bound development in a flow shop electronic assembly problem with carryover sequence-dependent setup time
MTY Sabouni, R Logendran
Computers & Industrial Engineering 122, 149-160, 2018
162018
Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times
MTY Sabouni, F Jolai, A Mansouri
Journal of Intelligent Manufacturing 21, 439-449, 2010
122010
A simplified branch-and-price mechanism for a three-machine dynamic PCB assembly
MT Yazdani Sabouni, R Logendran
Applied Mechanics and Materials 598, 398-403, 2014
22014
An efficient branch-and-price approach for a dynamic PCB assembly
MTY Sabouni, R Logendran
IIE Annual Conference. Proceedings, 331, 2014
12014
Genetic algorithm application in a dynamic PCB assembly with carryover sequence-dependent setups
MTY Sabouni, R Logendran
International Journal of Industrial and Manufacturing Engineering 7 (4), 641-649, 2013
12013
PCB assembly in a multi-machine flowshop with dynamic board release times
MT Yazdani Sabouni, R Logendran
Advances in Sustainable and Competitive Manufacturing Systems: 23rd …, 2013
12013
Bicriteria carryover sequence-dependent group scheduling in PCB manufacturing
MTY Sabouni, R Logendran
IIE Annual Conference. Proceedings, 1, 2011
12011
Group scheduling in electronics manufacturing with integration of internal and external setup times
MT Yazdani Sabouni
2014
A Lower Bound Based Branch-and-Price Mechanism in the Integration of Kitting and Assembly Operations
MTY Sabouni, R Logendran
IIE Annual Conference. Proceedings, 3014, 2013
2013
A Heuristic to Integrate External and Internal Setup Times
MTY Sabouni, R Logendran
IIE Annual Conference. Proceedings, 1, 2012
2012
O sistema não pode executar a operação agora. Tente novamente mais tarde.
Artigos 1–13