Jose Elias Claudio Arroyo
Título
Citado por
Citado por
Ano
Genetic local search for multi-objective flowshop scheduling problems
JEC Arroyo, VA Armentano
European Journal of operational research 167 (3), 717-738, 2005
2202005
An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem
VA Armentano, JE Claudio
Journal of Heuristics 10 (5), 463-481, 2004
842004
A GRASP algorithm for the multi-criteria minimum spanning tree problem
JEC Arroyo, PS Vieira, DS Vianna
Annals of Operations Research 159 (1), 125-133, 2008
722008
A GRASP algorithm for the multi-objective knapsack problem
DS Vianna, JEC Arroyo
XXIV International Conference of the Chilean Computer Science Society, 69-75, 2004
712004
Multi-objective variable neighborhood search algorithms for a single machine scheduling problem with distinct due windows
JEC Arroyo, R dos Santos Ottoni, A de Paiva Oliveira
Electronic Notes in Theoretical Computer Science 281, 5-19, 2011
612011
Heurísticas e metaheurísticas para otimização combinatória multiobjetivo
JEC Arroyo
[sn], 2002
522002
Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times
JEC Arroyo, JYT Leung
Computers & Operations Research 78, 117-128, 2017
462017
A GRASP heuristic for the multi-objective permutation flowshop scheduling problem
JEC Arroyo, AA de Souza Pereira
The International Journal of Advanced Manufacturing Technology 55 (5-8), 741-753, 2011
422011
An effective iterated greedy algorithm for scheduling unrelated parallel batch machines with non-identical capacities and unequal ready times
JEC Arroyo, JYT Leung
Computers & Industrial Engineering 105, 84-100, 2017
352017
A partial enumeration heuristic for multi-objective flowshop scheduling problems
JEC Arroyo, VA Armentano
Journal of the Operational Research Society 55 (9), 1000-1007, 2004
352004
Hybrid GRASP heuristics to solve an unrelated parallel machine scheduling problem with earliness and tardiness penalties
JP De CM Nogueira, JEC Arroyo, HMM Villadiego, LB Gonçalves
Electronic Notes in Theoretical Computer Science 302, 53-72, 2014
312014
Iterative local search heuristic for the single machine scheduling problem with sequence dependent setup times and due dates
JEC Arroyo, GVP Nunes, EH Kamke
2009 Ninth International Conference on Hybrid Intelligent Systems 1, 505-510, 2009
262009
An iterated greedy algorithm for total flow time minimization in unrelated parallel batch machines with unequal job release times
JEC Arroyo, JYT Leung, RG Tavares
Engineering Applications of Artificial Intelligence 77, 239-254, 2019
232019
Hybrid metaheuristic for the single vehicle routing problem with deliveries and selective pickups
BP Bruck, AG dos Santos, JEC Arroyo
2012 IEEE Congress on Evolutionary Computation, 1-8, 2012
202012
A GRASP heuristic with Path-Relinking for a bi-objective p-median problem
JEC Arroyo, M dos Santos Soares, PM dos Santos
2010 10th International Conference on Hybrid Intelligent Systems, 97-102, 2010
142010
An in-silico immune system model for investigating human autoimmune diseases
MA Possi, AP Oliveira, CM Chaves, FR Cerqueira, JE Arroyo
XXXVII Conferencia Latinoamericana de Informática (XXXVII CLEI), 2011
132011
A multi-objective genetic algorithm with path relinking for the p-median problem
JEC Arroyo, PM Dos Santos, MS Soares, AG Santos
Ibero-American Conference on Artificial Intelligence, 70-79, 2010
122010
A GRASP based algorithm for efficient cluster formation in wireless sensor networks
V de Oliveira Matos, JEC Arroyo, AG dos Santos, LB Gonçalves
2012 IEEE 8th International Conference on Wireless and Mobile Computing …, 2012
112012
A particle swarm optimization algorithm for topology control in wireless sensor networks
RC Abreu, JEC Arroyo
2011 30th International Conference of the Chilean Computer Science Society, 8-13, 2011
112011
A combination of evolutionary algorithm, mathematical programming, and a new local search procedure for the just-in-time job-shop scheduling problem
AG Dos Santos, RP Araujo, JEC Arroyo
International Conference on Learning and Intelligent Optimization, 10-24, 2010
112010
O sistema não pode executar a operação agora. Tente novamente mais tarde.
Artigos 1–20